Loading

Crackit User Manual

Boulder removal, rock splitting, quarrying, and concrete demolition can all run without explosives. Crackit is a powder that expands when mixed with water — fill your drilled holes, wait for cracks, then remove the pieces. The guides on this site cover planning, hole layout, mixing ratios, and what to expect at different temperatures.

Product overview

Type:
Universal grade — works across the temperature range listed in our charts.
Packing:
5 kg sealed bags, 4 bags per carton (20 kg), 50 cartons per wooden pallet.
Form:
Loose powder or pre-formed cartridges — specify when ordering.
Reaction Time Control:
Reaction inhibitor sachets available on request to slow the mix on hot days or fast jobs.

Checking material temperature

Measuring rock or concrete temperature in a drill hole

Lower a thermometer to the bottom of a drilled hole and leave it for 2–3 minutes, then read it quickly on the way out. Don't measure immediately after drilling — friction heat will give you a false high reading. The temperature of the stone or concrete itself (not just the air) decides which mix adjustments you need, so this step comes first.